Nursling 400kV Substation

National Grid received a connection application from Pivot Power for connection of a 49.9MW Battery Energy Storage System (BESS) at Nursling Substation.

The proposal is that the Battery Energy Storage Connection will be connected to the existing Supergrid Transformer (SGT1) tertiary windings via a 33/13kV 60MVA transformer to manage fault levels.

The BESS will be connected via 33kV cables to the new 33/13kV transformer sited within the 400kV compound.

The Works include working collaboratively with National Grid to develop a solution and to provide detailed civil, primary and secondary design and engineering, project management, SHEQ management, procurement of materials and equipment, civil works, installation and commissioning of new primary equipment, protection and control panels etc. 